International Space Station Timelines (June 16 2009)
These are copies of the flight plan timelines used by the crew onboard the International Space Station. The timelines are sent to the crew in Russian, and partially translated for ground controllers in America. No all-English translations are available at this time.
Radiogram No. 517u Form 24 for 06/16/09
ISS Handover. Tool Stowage
GMT CREW ACTIVITY
06:00-06:10 Morning Inspection
06:10-06:40 Post-sleep
06:40-07:30 BREAKFAST
07:30-07:55 Daily Planning Conference (S-band)
07:55-08:15 Work Prep
08:15-09:00 FE-1 Remove Items from Lab 1S6/P6 Stowage Location
08:15-08:35 FE-4 Actiwatch Battery Replacement
08:15-10:15 CDR, FE-3 EVA Tool Stow, Update IMS
08:15-09:30 FE-2 Physical Exercise (ARED)
08:15-08:25 FE-5 WRS Water Sample Analysis
08:25-09:25 FE-5 WRS Sample Collection
08:35-09:35 FE-4 ICV Hardware Setup
09:00-09:10 FE-1 Glove Box (MSG) Activation
09:10-09:40 FE-1 SPICE Experiment
09:25-10:25 FE-5 Physical Exercise (TVIS)
09:30-10:45 FE-2 Physical Exercise (CEVIS)
09:35-09:45 FE-4 Makita Battery Charge Setup
09:40-10:40 FE-1 SPICE Test Operations
10:15-10:45 FE-3, CDR Pressurizing Spare Elektron Liquid Unit #056
10:25-12:40 FE-5 SM Water Sampling
10:40-10:50 FE-1 SPICE Replacement
10:45-11:20 FE-2 PHOSRA-1 Coolant Sampling
10:45-11:05 CDR PLANTS-2 Data Downlink
10:45-11:45 FE-3 Physical Exercise (CEVIS)
10:50-11:50 FE-1 SPICE Hardware Test
11:05-11:25 CDR Preparing for ТВМ1 Replacement (A11)
11:15-11:20 FE-4 Makita Battery Charge Swap
11:20-12:50 FE-4 Physical Exercise (ARED)
11:25-12:25 CDR Physical Exercise (VELO) Day 2
11:45-12:35 FE-3 MATRYOSHKA-R. BUBBLE-Dosimeter Initialization and Deployment
11:50-12:50 FE-2 PHOSRA-1 Coolant Sampling
12:25-12:55 CDR TVIS Crew Hygiene
12:40-12:45 FE-5 TOCA 2 Data Recording
12:45-12:55 FE-5 Water Sample Analysis
12:50-12:55 FE-4 Makita Battery Charge Swap
12:55-13:55 LUNCH
13:55-14:05 FE-1 SPICE Videotape Exchange
13:55-14:10 FE-4 Private Medical Conference (S-band)
13:55-15:55 CDR, FE-3 E19/E20 Handover
13:55-14:55 FE-5, FE-2 E19/E20 Handover
14:05-14:15 FE-1 SPICE Microdrive Exchange
14:10-14:15 FE-4 Swap Makita Battery and Initiate Charge
14:15-14:20 FE-1 Glove Box (MSG) Powerdown
14:20-14:35 FE-1 Private Medical Conference (S-band)
14:35-14:50 FE-4 BISE Setup
14:50-15:30 FE-4 BISE Experiment Setup
14:55-15:10 FE-2 Private Medical Conference (S-band)
15:05-15:25 FE-5 Microbiology Water Analysis Kit (MWAK) In-Flight Coliform Detection
15:10-15:30 FE-2 Crew Quarter ATU Speaker Cover Installn
15:20-16:50 FE-1 Physical Exercise (ARED)
15:25-15:35 FE-5 EHS Water Reclamation
15:30-15:50 FE-2 HRF Vacuum Umbilical Disconnect
15:30-15:50 FE-4 BISE Operations
15:35-15:40 FE-5 BISE Historical Photography
15:50-15:55 FE-5 BISE Experiment Setup
15:55-16:00 FE-4 BISE Historical Photography
15:55-16:10 CDR, FE-3 Flush СРВК-2М Water Conditioning Unit Purification Columns (БК БКВ)
15:55-16:15 FE-5 BISE Operations
16:10-17:00 CDR PILLE Dosimeter Reading
16:10-17:10 FE-3 Physical Exercise (TVIS)
16:40-16:45 FE-4 Makita Battery Stowage
16:40-18:10 FE-5 Physical Exercise (ARED)
16:50-17:50 FE-1 Physical Exercise (CEVIS)
17:00-18:00 FE-4 Physical Exercise (TVIS)
17:00-17:20 CDR IMS Edit
17:10-17:40 FE-3 TVIS Crew Hygiene
17:20-18:05 CDR Evening Work Prep
17:50-17:55 FE-1 BISE Experiment Setup
17:55-18:30 FE-1 BISE Operations
18:00-18:05 FE-4 BISE Photo Documentation
18:00-18:40 FE-3 СОЖ Maintenance
18:05-19:05 FE-2 Evening Work Prep
18:05-18:35 FE-4 BIORHYTHM Data Upload
18:05-19:05 CDR Physical Exercise (ARED) Day 2
18:10-18:20 FE-5 TOCA 2 Data Recording
18:20-19:05 FE-5 Evening Work Prep
18:30-19:05 FE-1
18:35-19:00 FE-4
18:40-19:05 FE-3
19:00-19:05 FE-4 Transfer TVIS, CEVIS, and HRM data to MEC
19:05-19:30 Daily Planning Conference (S-band)
19:30-21:20 CDR Pre-sleep
19:30-21:30 FE-5, FE-1, FE-4, FE-3, FE-2
21:20-21:30 CDR SONOCARD Experiment Run Start
21:30-06:00 SLEEP
TASK LIST CDR URAGAN Observations and Photography
Notes:
1. SM Window #9 shutter opening is at crew discretion w/ Report to MCC
2. See OSTP for references to US activities
End of Radiogram
0 comments:
Post a Comment