These are copies of the flight plan timelines used by the crew onboard the International Space Station. The timelines are sent to the crew in Russian, and partially translated for ground controllers in America. No all-English translations are available at this time.

Rg 512u form 24 for 06/15/09
Air Pressure Unite (БНП) R&R in DC1. R&R - Water Conditioning Unit Compressor (БК
БКВ) in Water Regen System СРВК-2М

Time Crew Activity (ODF or RG)

06:00-06:10 CDR,FE-1,FE-3,FE-5 Morning inspection
06:00-06:05 FE-2,FE-4 Taking bisphosphonate pills
06:05-06:15 FE-2,FE-4 Morning inspection
06:10-06:40 CDR,FE-1,FE-3,FE-5 Post-sleep
06:15-06:45 FE-2,FE-4
06:40-07:30 CDR,FE-1,FE-3,FE-5 Breakfast
06:45-07:35 FE-2,FE-4
07:30-07:45 CDR
07:30-07:50 FE-1,FE-3, FE-5Work prep
07:35-07:50 FE-2,FE-4
07:45-07:50 CDR РАСТЕНИЯ-2. HW monitoring.
07:50-08:15 . DPC (S-band)
08:15-08:20 FE-2,FE-4 Work prep
08:15-08:25 FE-1 Glovebox (MSG) - activation
08:20-08:30 CDR,FE-3 Temp monitoring for secondary purification unit after Electron activation.
08:25-08:40 FE-1 MSG – replace recording device.
08:25-08:55 FE-4 Visual inspection of smoke sensors in A/L
08:30-11:00 CDR,FE-3 Post-EVA - Restoring initial ISS config
08:40-09:55 FE-2 PE TVIS
08:40-08:55 FE-1 SPICE-FAN-КАЛ
08:50-09:00 FE-5 CBEF – cleaning and removing centrifuge
08:55-09:15 FE-1 SPICE – removing burn deposits
08:55-09:25 FE-4 Visual inspection of smoke sensors in Node-1
09:00-09:40 FE-5 CBEF – cleaning and stowage
09:15-09:45 FE-1 SPICE – filling new fuel container.
09:25-10:10 FE-4 Visual inspection of smoke sensors in Lab
09:40-09:50 FE-5 CBEF-MG - ops
09:45-10:45 FE-1 SPICE – hw testing
09:50-10:30 FE-5 CBEF – wiping and stowing MG
09:55-11:10 FE-2 PE ARED
10:10-10:40 FE-4 FDS-ND2 BF/SD-ОСМ
10:30-10:50 FE-5 Installing Clean Bench
10:40-10:50 FE-4 EHS - GC/DMS start
10:45-10:55 FE-1 SPICE – HW replacement.
10:50-11:50 FE-4 PE-CEVIS
10:50-11:15 FE-5 Clean Bench – DC valves check
10:55-11:55 FE-1 SPICE – hw testing
11:00-11:40 CDR Post-EVA – reconfig DC1 into initial state. Installing phantom and activating
ЛЮЛИН-5. Tagup with specialists(S-band)
11:00-11:40 FE-3 СОЖ Maintenance Monitoring sensor ИП-1
11:15-11:50 FE-5 Clean Bench – checking DC valves
11:50-12:10 FE-3 IMS update
11:50-13:20 FE-2 WHC – replacing urine receptacle and insert
11:50-13:20 FE-4 PE ARED
11:50-12:20 FE-5 Clean Bench – to stowage mode
11:50-12:50 CDR PE TVIS-1
12:10-13:10 FE-3 PE (ВЕЛО)
12:20-13:20 FE-1,FE-5 ISS19 to ISS20 handover
12:50-13:20 CDR Hygiene after PE
13:10-13:20 FE-3 Verifying absence of cooling agent on housing of half-coupling 4ГБ4 КОБ2
13:20-14:20 . Lunch
14:20-15:50 CDR,FE-3 R&R – Compressor of Water Conditioning Unit (БК БКВ) in Water Regen System СРВК-2М. Install #701012 (00047153R,ФГБ1ПГО4_415_1, bag
365-13), removed unit – update in IMS
14:20-14:50 FE-4 TVIS monthly maintenance
14:20-15:50 FE-2 JPM. IMV flow measurement
14:20-14:30 FE-1 SPICE – cartridge replacement.
14:30-14:40 FE-1 SPICE – micro-drive replacement.
14:40-14:45 FE-1 Glovebox (MSG) – turn off power
14:45-15:45 FE-1,FE-5 ISS19 to ISS20 handover
15:00-15:30 FE-4 BIORHYTHM – prep and recording
15:45-17:15 FE-5 PE (ARED)
15:45-15:50 FE-4 EHS - GC/DMS end
15:50-16:05 FE-3 PMC (Ku+S-band)
15:50-16:50 CDR R&R – Air Pressure Unit (БНП) in DC1. Remove unit #7, for disposal,
update IMS
16:10-17:10 FE-1 PE TVIS
16:10-18:10 FE-2,FE-4 ISS19 to ISS20 handover
16:10-17:10 FE-3 Replacing air-extinguishers ОСП-4 (3 items) In FGB. Install 00039084R
ФГБ1ПГО_2_229_1, 00039085R, 00039086R ФГБ1ПГО_4_429_1
16:50-17:05 CDR PMC (Ku+S-band)
17:05-18:05 CDR PE ВЕЛО – for one day
17:10-18:10 FE-3 PE TVIS
17:10-18:40 FE-1 PE (ARED)
17:15-18:15 FE-5 PE (CEVIS)
18:10-18:15 FE-4 TVIS CEVIS HRM data transfer to MEC
18:10-18:40 FE-3 Hygiene after PE
18:15-18:40 CDR,FE-2,FE-4,FE-5 Evening work prep
18:40-19:05 . DPC (S-band)
19:05-19:30 . Evening work prep
19:30-21:30 . Pre-sleep
21:30-06:00 . Sleep

TASK LIST CDR УРАГАН. Observation and photographing

Notes:
1. Window No. 9 shutter opening is at crew discretion with Report to MCC
2. See OSTP for references to US activities
End of radiogram