In Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida, technicians are halfway complete with a three-day leak test on space shuttle Endeavour's environmental control and life support system, as well as structural leak tests.
The shuttle's move, also known as rollover, to the Vehicle Assembly Building is scheduled for Dec. 12. Once inside, the Endeavour will be hoisted and then lowered onto the waiting mobile launcher platform where the massive external fuel tank and solid rocket boosters stand ready.
Today, the six STS-130 astronauts are studying flight procedures at NASA's Johnson Space Center in Houston.
Shuttle Endeavour, with its payload of the Tranquility node and the seven-windowed Cupola module, is targeted to launch Feb. 4, 2010.
Endeavour's STS-130 Mission
Commander George Zamka will lead the STS-130 mission to the International Space Station aboard space shuttle Endeavour. Terry Virts will serve as the pilot. Mission specialists are Nicholas Patrick, Robert Behnken, Stephen Robinson and Kathryn Hire. Virts will be making his first trip to space.
Endeavour will deliver a third connecting module, the Tranquility node, to the station in addition to the seven-windowed Cupola module, which will be used as a control room for robotics. The mission will feature three spacewalks.
Liftoff from NASA's Kennedy Space Center in Florida is targeted for February 4, 2010 at 5:52 a.m. EST.
Additional Resources
› STS-129 Mission Information
0 comments:
Post a Comment