GMT CREW ACTIVITY
06:00-06:10 CDR, FE-3, FE-4, FE-5 Morning inspection
06:00-06:05 FE-1, FE-2 SLEEP data logging
06:05-06:10 FE-1, FE-2 Morning inspection
06:10-06:40 Post-sleep
06:40-07:30 BREAKFAST
07:30-09:00 FE-2 Periodic fitness check – routine ops (subject)
07:30-07:35 CDR PLANTS-2. Hardware monitoring
07:30-07:35 FE-4 EFBM prep: Scopemeter charge
07:30-09:00 FE-5 Physical Exercise (ARED)
07:45-09:00 FE-1 Powering up HRF PC1 from SUP and connecting cable to Actiwatch
08:00-08:30 FE-4 Periodic fitness check – routine ops (assist)
08:30-09:00 FE-4 Orbital Satellite Comm System: changing out 1553 jumper
08:45-09:45 CDR Physical Exercise (VELO) - 3
09:00-10:15 FE-2 Physical Exercise (ARED)
09:00-10:00 FE-1 Physical Exercise (CEVIS)
09:00-10:15 FE-4, FE-5 Return items prepack for return on 2J/A
09:45-10:15 CDR Hygiene procedures
10:10-10:15 FE-1 PBA transfer
10:10-10:15 FE-3 On MCC Go ISS repress using oxygen from Progress No. 402 СРПК (start)
10:15-11:15 LUNCH
11:15-12:30 FE-1, FE-2 EVA tool prep
11:15-11:20 FE-3 ISS repress using oxygen from Progress No. 402 СРПК (term)
11:15-11:25 CDR Complete discharge of 2nd 825М3 unit of Orlan , and start 3rd unit, serial No. 1268990196, b/c 00044938R, discharge
11:15-12:15 FE-5 Physical Exercise CEVIS
11:15-12:45 FE-4 Physical Exercise ARED
11:20-12:00 FE-3 СОЖ maintenance
11:25-11:35 CDR Cleaning pre-filter in УОВ "Поток-150МК" in SM and FGB (use vacuum cleaner with slot head)
12:15-13:15 FE-3 Physical Exercise (VELO), day 3
12:15-12:30 FE-5 IMV valve flow rate measurements
12:30-12:50 FE-5 Marking damage size on the SLD
12:30-14:00 FE-1 Physical Exercise (ARED)
12:30-13:45 FE-2 Physical Exercise (CEVIS)
12:40-12:50 CDR Photographing TVIS SLD damage
12:50-13:00 FE-5 SPD platform install
13:15-13:45 FE-3 Hygiene procedures
13:30-13:40 FE-5 FCF: alignment guide installation
13:40-13:45 FE-5 TVIS, CEVIS, and HRM data transfer to MEC
13:45-15:45 CDR, FE-2, FE-3, FE-4, FE-5 Pre-sleep
14:00-14:20 FE-1
14:20-14:35 FE-1 Private psychological conference (Ku+S-band)
14:35-15:45 FE-1 Pre-sleep
15:45-00:15 SLEEP
Task List
CDR, FE-3 Urine transfer from ЕДВ-У to Progress No. 402 Rodnik tank
CDR URAGAN. Observation and photography
CDR EKON. Observation and photography
Notes: 1. Window No. 9 shutter opening is at crew discretion with Report to MCC 2. See OSTP for references to US activities
End of radiogram